2016 - 2018

The demo system was commercially operated after being sold to an anaerobic digestion company processing pre-consumer food waste.


2011 - 2014

A mobile demonstration unit was installed at a third-party development plant. Demonstrated The technical feasibility of MSW Organics as feedstock for Cellulosic Ethanol.


2005 - 2007

Commercial scale demonstration supported the development of critical IP.


2018 - Present

The first commercial-scale BurCell® System was installed at Synergy Solutions Crips County in Cordele, GA. The BurCell® System was integrated into the existing MRF to recover organic products from mixed MSW.


2015 - 2016

Marathon Equipment Company built an industrial-scale demo system. A test bed for manufacturing Optimization was installed at a commercial transfer station. More than 200 loads of MSW were processed to optimize the operations procedures.


2009 - 2012

Materials testing facility Withpilotscale. Multipleorganics Feedstocks tested demonstrated the Technology suitability as an AD Pretreated system.